Riverside & Pickering Marine Contractors offers a FREE Preventative Maintenance Inspection on your existing waterfront structures. Whether you need a repair or rebuild or you’d like a condition analysis, Riverside & Pickering Marine Contractors can assist.
Call today for a complimentary analysis on the condition of your:
- Pier
- Wharf
- Decking
- Stringers
- Cross Bracing
- Pilings
- Railings
- Gangways
- Floats
- Retaining Walls
- Seawalls
- And More
Painting Pressure Treated Lumber
There are several websites available with recommended applications on painting pressure treated lumber. The lumber will naturally gray if not treated. Water sealer will help minimize splintering. If the lumber is new, sealer should not be applied for as least 6 month to allow the treatment to dry.
Dock Winterization
If you have any questions pertaining to the importance of removing your ramp and float, we will be happy to discuss options and direct you to someone who provides this service.
Contact us today for all your New Hampshire or Maine marine dock, pier or wharf maintenance and repairs.